Legacy application modernization without the big-bang rewrite

We modernize ageing applications in stages: replacing outdated frameworks, breaking monoliths into services where it pays off, and moving workloads to the cloud while the business keeps running. Each stage ships working software and reduces risk, rather than betting everything on one cutover date.

What's included

The 6 areas this service covers. Take one, or combine them into a single engagement.

Application and code assessment

Analysis of architecture, code quality, dependencies, security issues and undocumented business rules, producing a ranked list of what to keep, refactor, replace or retire.

Framework and platform upgrades

Upgrades from .NET Framework to modern .NET, from older Java and PHP versions, and from AngularJS or jQuery front ends to React or Angular.

Monolith decomposition

Gradual extraction of services from a monolith using the strangler fig pattern, starting with the parts that change most often or limit scaling.

Database modernization

Migration from legacy or licensed databases to PostgreSQL or managed cloud databases, with schema redesign, data validation and parallel-run reconciliation.

API enablement

REST or GraphQL APIs placed in front of legacy systems, so new web, mobile and partner applications can use existing data and logic safely.

UI and UX modernization

Redesign of outdated desktop or web interfaces into responsive applications, keeping the workflows power users depend on while removing friction.

How the engagement runs

Five stages, each ending with something you can review and approve.

  1. 1

    Discovery and assessment

    We study the codebase, infrastructure and usage, interview users and document the business rules hidden in the code.

  2. 2

    Modernization strategy

    We choose an approach per component, whether rehost, replatform, refactor or replace, and sequence the work by value and risk.

  3. 3

    Safety net

    We add automated tests, monitoring and CI/CD around the existing system so changes can be verified before and after each step.

  4. 4

    Incremental migration

    We modernize component by component, running old and new side by side and routing traffic gradually to the new implementation.

  5. 5

    Decommission and handover

    We retire legacy components once replaced, migrate remaining data and hand over documentation for the new system.

Why teams choose INFIDEC for this

Technologies we use

  • .NET
  • Java
  • Spring Boot
  • Node.js
  • React
  • Angular
  • PostgreSQL
  • Docker
  • Kubernetes
  • AWS
  • Microsoft Azure
  • Terraform
  • SonarQube
  • GitHub Actions

Lower operational risk

Supported frameworks, current security patches and fewer single points of knowledge reduce the chance of outages and breaches.

Faster feature delivery

Cleaner code, automated tests and modern tooling make changes that once took months achievable in normal sprints.

Reduced licensing and hosting costs

Moving off end-of-life platforms and licensed databases often removes significant recurring costs.

Business continuity throughout

Staged delivery keeps the existing system running while modernization proceeds, with no single high-risk cutover.

Related case studies

Retail & eCommerce

A headless commerce replatform for a multi-brand fashion retailer

We moved three storefronts off an ageing monolithic platform to a headless architecture with a shared commerce backend, a composable CMS and faster, more maintainable frontends.

faster median mobile load on product listing pages
38%faster median mobile load on product listing pages
increase in mobile conversion rate after full cutover
12%increase in mobile conversion rate after full cutover
unplanned outages during the following peak sale season
0unplanned outages during the following peak sale season

Manufacturing & Industry 4.0

IoT predictive maintenance and a modernised MES for a component manufacturer

We connected machine sensors across two plants to a predictive maintenance pipeline and incrementally replaced a legacy manufacturing execution system without stopping production.

reduction in unplanned downtime on monitored assets
23%reduction in unplanned downtime on monitored assets
faster production reports for plant managers
4.5xfaster production reports for plant managers
production shifts lost during the MES cutover
0production shifts lost during the MES cutover

Frequently asked questions

Should we rewrite the application from scratch?

Usually not. Full rewrites tend to take longer than planned and lose business rules nobody documented. We recommend incremental modernization in most cases, and a rewrite only for small systems or where the existing code genuinely cannot be salvaged.

How long does legacy modernization take?

An assessment and roadmap typically takes three to six weeks. Execution depends on system size and the chosen approach; most projects deliver the first modernized component within a few months and continue in stages after that.

Can the old system keep running during modernization?

Yes. We run old and new components side by side, route traffic gradually and keep rollback paths open, so users continue working throughout.

What if nobody understands the legacy code anymore?

This is common. We reverse-engineer behaviour from the code, database and logs, write characterisation tests that capture what the system currently does, and validate findings with your users before changing anything.

Planning a project? Let's scope it together.

Tell us where you are and what you need. A senior engineer replies within 24 hours with next steps, not a sales script.